23.02.2012
Intermediary warehouse - 480 sq.meters
Quarantine zone - 94 pallets capacity
Pharmaceutical Bulk area - 16 pallets capacity
Primary packaging materials area - 16 pallets capacity
Secondary packaging materials area - 10 pallets capacity
Rejected products and materials area (red zone) - 12 pallets capacity
Central warehouse - 2000 sq.meters
Pharmaceutical Bulk area - 129 pallets capacity
Primary packaging materials area - 78 pallets capacity
Secondary packaging materials area - 121 pallets capacity
inished products area - 372 pallets capacity
Loading/unloading facilities, including 1,5 tons electric forklift
Additional information
1) Staff: two specialists M.Sc. and 3 warehouse operators.
Equipment: 2 adjusting plate-forms for loading / en loading;
an electrical forklift. System of PC and warehouse controling
program for the materials movement.
2) All the warehouse area is under humidity and temperature
controlled conditions - AHU system.
1) Staff: two specialists M.Sc. and 3 warehouse operators.
Equipment: 2 adjusting plate-forms for loading / en loading;
an electrical forklift. System of PC and warehouse controling
program for the materials movement.
2) All the warehouse area is under humidity and temperature
controlled conditions - AHU system.
